Factory building crane repair and drive design

Lost and damaged parts never found, the new drive chains are different from the original. New wheel, new console, new motor and gear. The exact original speed of the crane was measured by stopwatch and rotates what we could see when the other crane was moving. All the two axis drive was redesigned and changed.

Recent Posts
Archive

ipari formatervezés, formatervező mérnök, industrial design

CONTACT

  • behance-icon-white
  • LinkedIn - White Circle
  • Facebook - White Circle
  • YouTube - White Circle

© 2016 ARIEL LEVAY