top of page

Factory building crane repair and drive design

  • Writer: levayariel
    levayariel
  • Aug 11, 2016
  • 1 min read

Lost and damaged parts never found, the new drive chains are different from the original. New wheel, new console, new motor and gear. The exact original speed of the crane was measured by stopwatch and rotates what we could see when the other crane was moving. All the two axis drive was redesigned and changed.

 
 
 

Comments


Recent Posts
Archive
bottom of page